虚拟电厂落地适应性分析——以阿荣旗奶源基地为例*
|
张赢, 赵建勇, 何麟, 林嘉恒
|
Adaptability Analysis of Virtual Power Plant Implementation:A Case Example from Arongqi Milk Source Base
|
ZHANG Ying, ZHAO Jianyong, HE Lin, LIN Jiaheng
|
|
表5 储能装置参与削峰填谷日最大收益汇总表
|
|
|
储能容量/ (MW/MW·h) | 日收益/元 | 建设成本/万元 | 回收周期/年 | 1/1 | 203.75 | 200 | 26.96 | 1/2 | 203.21 | 400 | 53.93 | 2/2 | 301.70 | 400 | 36.32 | 2/3 | 321.35 | 600 | 51.15 | 2/4 | 980.28 | 800 | 22.36 | 3/3 | 228.06 | 600 | 72.10 | 3/4 | 982.50 | 800 | 22.30 | 3/5 | 1 346.50 | 1 000 | 20.35 | 3/6 | 1 634.21 | 1 200 | 20.12 | 4/4 | 1 049.07 | 800 | 20.89 | 4/5 | 1 412.19 | 1 000 | 19.40 | 4/6 | 1 270.33 | 1 200 | 25.88 | 4/7 | 1 605.35 | 1 400 | 23.89 | 4/8 | 1 306.24 | 1 600 | 33.56 | 5/5 | 1 556.36 | 1 000 | 17.60 | 5/6 | 1 377.12 | 1 200 | 23.87 | 5/7 | 1 562.83 | 1 400 | 24.54 | 5/8 | 1 948.32 | 1 600 | 22.50 | 5/9 | 1 913.58 | 1 800 | 25.77 | 5/10 | 1 290.59 | 2 000 | 42.46 |
|
|
|