750kV输电线路风偏跳闸原因分析及改造措施研究 |
杨肖辉,张东,李晓光,董新胜,张振泉,陈艳超 |
Analysis and Reform Measures of 750kV Transmission Line Wind Biased Tripped |
Yang Xiaohui,Zhang Dong,Li Xiaoguang,Dong Xinsheng,Zhang Zhengquan,Chen Yanchao |
图4 计算风偏后导线距离杆塔塔身距离图 |
Fig.4 After the calculation of the wind from the wire rod tower tower distance map |
![]() |