750kV输电线路风偏跳闸原因分析及改造措施研究 |
||||||||||
杨肖辉,张东,李晓光,董新胜,张振泉,陈艳超 | ||||||||||
Analysis and Reform Measures of 750kV Transmission Line Wind Biased Tripped |
||||||||||
Yang Xiaohui,Zhang Dong,Li Xiaoguang,Dong Xinsheng,Zhang Zhengquan,Chen Yanchao | ||||||||||
表5 不同型号杆塔的重合成功允许风速值 |
||||||||||
Tab.5 allows the wind speed of the success of different models of tower overlap |
||||||||||
|
||||||||||