基于因子分析的输电线路造价的影响因素研究
|
|
刘琰,耿庆申,王宁宁,刘巍,尹彦涛
|
Study of the Factors Influencing of the Transmission Line Cost Based on Factor Analysis
|
|
Yan Liu,Qingshen Geng,Ningning Wang,Wei Liu,Yantao Yin
|
|
表A1 500kV输电线路工程指标
|
Tab.A1 Engineering quantity statistics of 500kV engineering
|
|
| 年份 | 土石方量 /(m3/基) | 基础混凝土量 /(m3/基) | 塔材量 /(t/km) | 线材量 /(t/km) | 塔材单价 /(元/t) | 线材单价 /(元/t) | 建场费 /(万元/km) | | 2005 | 303.83 | 35.37 | 43.58 | 14.96 | 6 438 | 18 107 | 12.17 | | 2006 | 311.96 | 38.06 | 46.3 | 15.18 | 6 649 | 17 401 | 12.9 | | 2007 | 202.39 | 24.61 | 38.87 | 15.2 | 7 363 | 23 648 | 13.73 | | 2008 | 483.9 | 49.95 | 56.31 | 16.41 | 6 800 | 16 800 | 14.02 | | 2009 | 525.8 | 88.53 | 78.43 | 16.69 | 9 083 | 17 751 | 16.7 | | 2010 | 683.4 | 96.51 | 98.17 | 16.48 | 7 480 | 16 132 | 18.99 | | 2011 | 659.05 | 75.55 | 143.34 | 17.75 | 7 100 | 16 066 | 26.7 | | 2012 | 822 | 168.62 | 141.51 | 26.47 | 7 800 | 17 750 | 23.51 | | 2013 | 557.67 | 59.28 | 77.09 | 14.46 | 6 419 | 16 800 | 44.03 |
|
|
|