基于因子分析的输电线路造价的影响因素研究
|
|
刘琰,耿庆申,王宁宁,刘巍,尹彦涛
|
Study of the Factors Influencing of the Transmission Line Cost Based on Factor Analysis
|
|
Yan Liu,Qingshen Geng,Ningning Wang,Wei Liu,Yantao Yin
|
|
表3 220kV输电线路工程指标
|
Tab.3 Engineering quantity statistics of 220kV engineering
|
|
| 年份 | 土石方量/ (m3/基) | 基础混凝土量 /(m3/基) | 塔材量/ (t/km) | 线材量/ (t/km) | 塔材单价/ (元/t) | 线材单价/ (元/t) | 建场费/ (万元/km) | | 2005 | 225.64 | 41.38 | 25.97 | 7.24 | 7 239 | 16 849 | 5.27 | | 2006 | 239.95 | 39.58 | 27.62 | 7.75 | 7 127 | 17 897 | 4.02 | | 2007 | 226.63 | 54.16 | 41.78 | 8.4 | 8 059 | 23 803 | 8.75 | | 2008 | 299 | 54.64 | 32.39 | 7.07 | 9 742 | 19 225 | 7.29 | | 2009 | 445.3 | 59.98 | 39.47 | 7.9 | 8 896 | 17 753 | 11.49 | | 2010 | 336.6 | 49.76 | 50.41 | 8.05 | 7 502 | 15 233 | 11.46 | | 2011 | 354.36 | 56.69 | 54.91 | 7.67 | 6 727 | 16 161 | 14.02 | | 2012 | 380.96 | 63.03 | 57.5 | 8 | 7 672 | 16 853 | 16.32 | | 2013 | 350.68 | 49.71 | 46.2 | 7.82 | 7 852 | 16 749 | 15.4 | | 2014 | 367.25 | 52.37 | 28.12 | 7.98 | 7 052 | 15 732 | 20.75 |
|
|
|