考虑检修计划的减供负荷功率概率计算方法
黄强1,吴杰康2,郑风雷1,林奕鑫2
A Probability Calculation Method for Reduced Supplying Load Power Considering Maintenance Planning
Qiang Huang1,Jiekang Wu2,Fenglei Zheng1,Yixin Lin2

图2. 莞城站、水乡站以及纵江站三级互联系统运行方式

Fig.2. Operation mode of three-level interconnected system between 500kV Guancheng,Shuixiang and Zhongjiang substation