分布式发电接入主动配电网的全局优化与研究
沈鑫,曹敏
Global Optimization and Research on Distributed Generation Integration to Active Distribution Network
Xin Shen,Min Cao
表1
仿真结果对比
Tab.1
The simulation results
规划
方案
规划结果
f
1
/ kW
f
2
/万元
f
3
(pu)
1
未接入DG
194.6
0
0.432
2
10(8.2),13(5.7),21(6.1),25(4.6),30(6.8)
153.4
875
0.342
3
8(5.4),10(6.4),19(5.2),22(7.1),26(6.9)
183.5
802
0.397
4
2(9.7),11(4.8),17(7.6),22(8.2)
171.7
890
0.287
5
2(8.7),10(6.3),25(8.3),32(4.1),28(5.7)
162.5
860
0.328
6
2(7.3),14(6.5),16(5.2),26(6.7),33(7.3)
158.2
817
0.312