新疆电网发电机组进相运行的现状研究与分析

Status Research and Analysis of Leading Phase Operation of Xinjiang Power Grid Generator Sets

  • 摘要: 对新疆电网发电机进相试运行及试验研究情况进行了总结,对进相运行的限制条件,包括定子铁心端部温升、定子电流、机端电压与厂用电、低励限制等限制因素进行分析。通过仿真软件对发电机励磁电压和励磁电流、无功功率和有功功率、功角进行了简单的仿真,最后针对目前新疆电网发电机组进相运行情况提出相关建议。

     

    Abstract: The situation of pilot phase test and test research of Xinjiang power grid is summarized. The limiting conditions for phase advance operation including stator core temperature rise, stator current, terminal voltage and power consumption, and low excitation limit are analyzed. The simulation software is used to simulate the excitation voltage and excitation current, reactive power, active power and power angle of the generator. Finally, some suggestions are put forward for the current phase operation of the Xinjiang power grid generator set.

     

/